Forms

Forms

For existing customers or those looking to start service at an address known to be served by BCWS for sewer and/or water:

Customer Service

Information
Form
Start/Stop Service
Letter of Connect
Leak Adjustment

Interested in connecting to our sewer and/or water services? The first step is to confirm that sewer and/or water is available.

Due Diligence Requests for Developers

For Developers requesting availability/due diligence (not for building permits), please email [email protected] and include the following information in your email:

  1. Owner/Developer Name, Company, and Complete Address
  2. Project Name, if applicable
  3. What will be on this site
    • Square foot of building/complete number of apartments/condos/townhomes/houses and possible estimated flow
    • If the parcel will be subdivided
    • Total acreage of the development

Engineering

Information
Form

Tap Availability Forms

Please complete and submit the tap availability e-form for sewer and/or water below. There is no charge for this service. This process will confirm if service is or is not available to your residential location. For commercial availability, please submit a due diligence request as shown above.

Residential Sewer Availability Application
Residential Water Availability Application

Tap Applications

Once availability is established, complete the appropriate pdf tap application below and email to [email protected] and [email protected]. BCWS Engineering will review the application and invoice for impact, connection, and inspection fees for your requested location.

Sewer Tap Application
Water Tap Application

For commercial services: BCWS requires a plan case to review the plans and calculations for the sewer and/water connections. Please submit a Development Review Application to have a WSOPS plan case created. Please refer to Appendix F32 for information on commercial service only projects, and Appendix F36 for submittal requirements.

Water Meter Application

If you are developing a commercial property with a main extension project or a service only project (WSPD or WSOPS plan cases) and require a 2" meter or larger, please submit the Commercial Building Water Meter Application to the plan case. For a main extension project (WSPD plan case), submit this when the electronic plans are approved, when hard copy plans are requested. For a service only project (WSOPS plan case), submit this when the plans are initially uploaded to the plan case.

Commercial Building Water Meter Application

Backflow Inspectors

Certified Testers
Field Testing and Maintenance Report for Backflow Prevention Assemblies

Flow Test Application

Hydrostatic Flow Test Request

Grease Interceptor Application

Business Grease Interceptor Application

You may email us at [email protected] for questions about project related tap applications or the commercial tap application process or [email protected] for questions about the individual residential tap application process. 

* Please note: All Berkeley County Water and Sanitation web pages are designed to operate with the Chrome browser. Some online forms may not work properly in other browsers.

Transferring to County OneBerkeley Portal

You are being redirected to our Resident Portal, another one of our official sites, to complete the online form you selected. You may need to create an account to access and submit the form.

You're Leaving This Site

You are about to visit an external link.
Do you wish to continue?