Water Details

Water Details
DescriptionFormatRevision Date
2 inch Blowoff Detail03/04/2015
2 inch Water Service Connection and Meter Box Installation02/22/2016
Backflow Prevention Required During Construction04/17/2017
Check Valve in Precast Utility Vault10/10/2008
Cutting-In Sleeve and Valve Installation11/24/2008
Double Check Valve Temporary Construction Assembly Only
Backflow Prevention Assembly Above Ground Installation
04/13/2018
Precast Vault (NEW)02/23/2016
Service Connection Without Meter01/30/2018
Tracing Wire Installation Detail01/25/2017
Typical Detail Ditch Crossing06/26/2009
Typical Detail Fire Hydrant with Valve and Box for Drainage Crossing06/26/2009
Typical Detail Fire Hydrant with Valve and Box04/14/2011
Typical Detail Post Hydrant with Valve and Box08/07/2009
Typical Detail Tapping Sleeve and Valve08/07/2009
Typical Detail Valve and Valve Box Installation04/14/2011
Typical 1" – 2" Double Check Valve Assembly Only,
Backflow Prevention Assembly Above Ground Installation (NEW)
02/23/2016
Typical Larger than 2" Double Check Valve Assembly Only,
Backflow Prevention Assembly Above Ground Installation (NEW)
02/23/2016
Typical Pressure Vacuum Breaker 1" – 2"
Backflow Preventer Above Ground (NEW)
02/23/2016
Typical Reduced Pressure Principle Assembly (all sizes)
Backflow Prevention Assembly Above Ground Installation (NEW)
02/23/2016
Typical Water Main Deflection01/30/2018
Valve and Line Marker Detail06/26/2009
Water Air Release Valve10/10/2008
Water Main Trench Detail10/10/2008
Water Note06/15/2015